
Citation-Backed Specification & Submittal Intelligence
Cross-reference 100+ page MEP engineering spec PDFs (CSI Divisions 21–28) against vendor quotes & submittals in 60s. Surface buried exclusions & shortfalls with exact [PAGE] citations, auto-drafted RFIs, and PDF Stamp + Procore/Excel CSV exports.
Pace needs two or more snapshots. This launch has 1, so velocity and momentum read as unmeasured rather than zero.
A source that found nothing is a measurement. A source that has not run is a gap. Neither means the launch lacks the thing.